Skip to content
Terminal Ledger Desk
一覧

テーマ別ピラーハブ · 20 件の公開ブリーフィング

Reg Sci Disaster Recovery Outage Rca

Reg Sci Disaster Recovery Outage Rca research topics and source records from Terminal Ledger Desk. When a matching engine, SIP market-data processor, or clearing house halts, trillions in price discovery freeze; SEC Regulation SCI and EU DORA mandate 2-hour geographic failover, Raft determinism, and annual DR drills.

機関投資家向け主要ポイント — Reg Sci Disaster Recovery Outage Rca

  • SEC Regulation SCI (17 CFR 242.1000–1007) requires covered exchanges, SIPs, clearing agencies, and high-volume ATSs to maintain geographically diverse DR sites with <= 2-hour RTOs.
  • Fiber speed-of-light physics (~14ms NJ-to-Chicago RTT) dictates a two-tier design: synchronous sub-100us Raft consensus inside the primary hall plus asynchronous WAN streaming to remote DR.
  • Forty-four percent of modern exchange outages stem from morning configuration pushes or software releases rather than physical hardware failures.
  • Never resume continuous matching directly on a frozen post-outage order book—always allow a Cancel-Only window followed by a transparent single-price Reopening Call Auction.
  • SEC Regulation SCI Rule 1001(a)(2)(v) requires covered venues to maintain geographically diverse backup sites capable of resuming trading within <= 2 hours (and shorter for Critical SCI systems).
  • Placing DR 30 km away in the same New Jersey metro fails geographic diversity due to shared power grids, weather corridors, and carrier POPs—making NJ <-> Chicago (~1,180 km) the US standard.

関連ナレッジグラフ・エンティティ (11)

全エンティティ →

トピック別リサーチブリーフィング一覧 — Reg Sci Disaster Recovery Outage Rca (20)

関連する規制対象金融機関・ブローカー調書

関連する金融監督当局・ライセンス枠組み

全監督当局一覧 →

よくある質問(FAQ) — Reg Sci Disaster Recovery Outage Rca

Which Alternative Trading Systems (ATS dark pools) are legally classified as "SCI ATSs" subject to Regulation SCI?

Under Rule 1000 of Regulation SCI, an NMS stock ATS crosses the SCI ATS threshold when during at least 4 of the preceding 6 calendar months it accounted for >= 5% in any single NMS stock (plus >= 0.25% total NMS market) OR >= 1% of aggregate average daily dollar volume across all NMS stocks.

Why can an exchange NOT preserve open resting Day orders seamlessly when failing over 1,200 km from New Jersey to Chicago?

During a sudden regional disaster destroying New Jersey power/telecoms, the asynchronous WAN stream to Chicago may lag by 5–20 milliseconds, and colocated NJ servers have died simultaneously. Leaving NJ market-maker quotes active in Chicago would expose blinded firms to catastrophic pick-off—so DR playbooks universally purge open Day orders and reopen via Call Auction!

Can a broker-dealer opt out of the annual SIFMA/FIA Reg SCI disaster-recovery test?

Not if designated! Rule 1004 requires every SCI entity to establish objective volume/clearing standards designating specific members/participants who are LEGALLY COMPELLED to connect to the backup DR site and execute test transactions during the annual coordinated test.

What is the difference between a standard "SCI System" and a "Critical SCI System"?

Critical SCI Systems (Rule 1000) are systems whose outage poses single-point systemic paralysis with no market substitute—specifically consolidated market-data SIPs (CTA/UTP/OPRA), clearing/settlement engines (NSCC/DTC/OCC), and primary listing reopeners—facing heightened SEC scrutiny and faster-than-2-hour recovery expectations.

Does SEC Regulation SCI require zero data loss (RPO = 0) if a meteor or grid collapse destroys the entire primary state instantaneously?

No—physics forbids 0-nanosecond synchronous replication across 1,180 km without adding 14ms to every colocation order! Instead, Rule 1001 requires deterministic reconciliation: exchanges replicate state continuously within milliseconds, publish the exact final Trade/Sequence ID recovered at the DR site, and instruct members to reconcile Drop-Copy fills against that cutoff.

Can a backup DR data center run on scaled-down 25% hardware capacity to save CapEx?

Never! Regulation SCI explicitly mandates that backup and recovery facilities possess sufficient capacity to handle full production peak volatility volumes—because the exact day a regional disaster strikes is guaranteed to generate massive institutional hedging volume!

関連するテーマ別リサーチハブ (Terminal Ledger Desk)

Reg Sci Disaster Recovery Outage Rca — テーマ別ピラーハブ | Terminal Ledger Desk | Terminal Ledger Desk